The lift installation process is done by a team of professional engineers. Installation is carried out by trained technicians with more than 10 years of experience by following the sequence and steps of lift installation from start to finish as follows:
1. Set up scaffolding.
2. Plumb bob down for measurement
3. Measure the width and lines exactly.
4. Install the plumb bob hanging under the ceiling and adjust
5. Continue using the guide rail.
6. Assemble the lift door.
7. Deploy the plumb bob from the ceiling to the bottom.
8. Make a plumb bob wire at the bottom.
9. Set up the guide rails and seize.
10. Install the door, cast the door and the lintel beam behind the door.
11. Set up the machine and switchboard.
12. Deploy the wiring on the lift’s engine pipe.
13. Hanging counterweights
14. Assemble the lift.
15. Hang the lift with a cable.
16. Assemble the lift’s equipment.
17. Install the door first or assemble it first.
18. Wiring pipes in the lift compartment
19. Testing process.
When the structure of the building is finished. The lift engine is deploy into the lift compartment, then wire to a cable attached to a hook at the lift engine room, then pull the engine onto the engine compartment. The staff will set up the guide rail correctly, then bring the door into the lift compartment.
Make a scaffold on the lift engine room that has no floor. Align the cables with the engine and cast the floor. Assemble cables and controller. Deploy the lift button controller and test the procedure.